Study on the Bottom Diversion Outlets of the Three Gorges Project
Construction of the Three Gorges Project is divided into three stages.The second stage is to close the left bank main riverbed, divert the stream duke waves and fades to the right bank open channd and build the spillway section in the mian river bed and the powerhouse on theleft bank.The spillway section will be provided with three rows of release